Builder Name:Vern Little   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:2375.6
Start/Last Date:Mar 06, 2018 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Voltar-S21

Home or Last Project Picture

Nov 15, 2022     Coanda Exit Fairing - (3.2 hours)       Category: Firewall
Continued fabrication of the Coanda exit fairing. Drilled for attachment rivets and fabricated brake reservoir line cover. The top row of rivets will be stainless, as a fire block. The bottom row can be aluminum, because they do not penetrate into the aircraft interior.

The exception is that the line cover will be attached with 4-40 stainless screws, to allow for maintenance.

"The Coanda effect is the tendency of a fluid jet to stay attached to a convex surface".